{"id":1344,"date":"2024-10-03T13:21:11","date_gmt":"2024-10-03T18:21:11","guid":{"rendered":"http:\/\/climaticdesign.net\/?page_id=1344"},"modified":"2024-10-08T10:29:22","modified_gmt":"2024-10-08T15:29:22","slug":"highlandtown-ems-addition","status":"publish","type":"page","link":"https:\/\/climaticdesign.net\/?page_id=1344","title":{"rendered":"Highlandtown EMS Addition"},"content":{"rendered":"\n<p><strong>Project Location:<\/strong> 231 S. Eaton Street, Baltimore, Maryland<br><strong>Owner:&nbsp;<\/strong>Maryland Stadium Authority<br><strong>Architectural Firm:<\/strong> JRS Architects<br><strong>Project description:<\/strong>&nbsp;Core Learning Space: K-2 Elementary\/Middle School<br><strong>Floor Area:<\/strong> 45,900 GSF<br><strong>Rating system: <\/strong>LEED-NC v2009<br><strong>Certification:<\/strong> Gold &#8211; September 2023<br><\/p>\n\n\n\n<p class=\"has-text-align-left\">The Highlandtown EMS is additions to an existing three-story building. Climatic Design, LLC developed a simplified energy model and preliminary energy analysis for the Highlandtown Elementary Middle School. Multiple Energy Conservation Measures (ECMs) were modeled to provide most effective and suitable design strategies in achieving the project\u2019s sustainability goal. With the execution of the recommended ECMs, the proposed design not only complies with the Minimum Energy Performance requirement but also achieved additional LEED points. The facility is 41.2% more energy cost efficient than the ASHRAE 90.1-2007 reference model. This equates to fifteen (15) LEED-NC 2009 EAc1 points. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-14.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"483\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-14.png\" alt=\"\" class=\"wp-image-1419\" style=\"width:840px;height:auto\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-14.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-14-300x149.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-14-768x380.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><figcaption class=\"wp-element-caption\">Rendering of the Baseline Reference Model with the original \u201cAs Is\u201d orientation, South West view<\/figcaption><\/figure><\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-15.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"486\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-15.png\" alt=\"\" class=\"wp-image-1420\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-15.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-15-300x150.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-15-768x383.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><figcaption class=\"wp-element-caption\">Rendering of the Baseline Reference Model demonstrating thermal zones of Level 1, North East view<\/figcaption><\/figure><\/div>\n\n<div class=\"wp-block-image is-resized\">\n<figure class=\"aligncenter size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-7.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"523\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-7.png\" alt=\"\" class=\"wp-image-1346\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-7.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-7-300x161.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-7-768x412.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><figcaption class=\"wp-element-caption\">Rendering of the Baseline Reference Model Demonstrating glazing types<\/figcaption><\/figure><\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13.png\"><img loading=\"lazy\" decoding=\"async\" width=\"906\" height=\"1024\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13-906x1024.png\" alt=\"\" class=\"wp-image-1379\" style=\"width:560px;height:632px\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13-906x1024.png 906w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13-265x300.png 265w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13-768x868.png 768w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/10\/image-13.png 975w\" sizes=\"(max-width: 906px) 100vw, 906px\" \/><\/a><\/figure><\/div>\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Location: 231 S. Eaton Street, Baltimore, MarylandOwner:&nbsp;Maryland Stadium AuthorityArchitectural Firm: JRS ArchitectsProject description:&nbsp;Core Learning Space: K-2 Elementary\/Middle SchoolFloor Area: 45,900 GSFRating system: LEED-NC v2009Certification: Gold &#8211; September 2023 The Highlandtown EMS is additions to an existing three-story building. Climatic Design, LLC developed a simplified energy model and preliminary energy analysis for the Highlandtown Elementary [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1344","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1344"}],"collection":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1344"}],"version-history":[{"count":12,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1344\/revisions"}],"predecessor-version":[{"id":1423,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1344\/revisions\/1423"}],"wp:attachment":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}