{"id":1710,"date":"2024-11-04T15:14:52","date_gmt":"2024-11-04T20:14:52","guid":{"rendered":"http:\/\/climaticdesign.net\/?page_id=1710"},"modified":"2024-11-04T15:14:52","modified_gmt":"2024-11-04T20:14:52","slug":"e-f-borgerding-district-court","status":"publish","type":"page","link":"https:\/\/climaticdesign.net\/?page_id=1710","title":{"rendered":"E.F. Borgerding District Court"},"content":{"rendered":"\n<p>Project Location: Baltimore Maryland<br>Owner: Board of Public Works<br>Architectural Firm: WGM Architecture + Interiors<br>Gross floor area: 45,500 GSF<br>Project type: Office<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-18.png\"><img loading=\"lazy\" decoding=\"async\" width=\"814\" height=\"548\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-18.png\" alt=\"\" class=\"wp-image-1711\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-18.png 814w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-18-300x202.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-18-768x517.png 768w\" sizes=\"(max-width: 814px) 100vw, 814px\" \/><\/a><figcaption class=\"wp-element-caption\"><sup>Courtesy of WGM Architecture + Interiors<\/sup><\/figcaption><\/figure>\n\n\n\n<p>Climatic Design LLC (CDL) has performed a simplified energy model simulation, a comprehensive energy analysis, and an assessment of the building systems and configuration for the E.F. Borgerding District Court (Borgerding DC). In addition, a Life Cycle Cost Analysis (LCCA) was performed to identify the best HVAC option based on first cost, maintenance costs, repair costs and energy costs of four HVAC options. Simulation results of the energy models that reflect the aforementioned HVAC options and the LCCA results demonstrate that Ground Source Heat Pump (GSHP) has the lowest annual energy cost ($38,735), highest initial cost and highest Present Value Life Cycle Cost. Variable Refrigerant Flow (VRF) system with DOAS has the second lower annual energy cost, but it\u2019s Present Value Life Cycle Cost (LCC PV$) is lower than the other options. In addition, VRF system has the highest cumulative Life-Cycle savings or net saving compared to GSHP.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-19.png\"><img loading=\"lazy\" decoding=\"async\" width=\"954\" height=\"437\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-19.png\" alt=\"\" class=\"wp-image-1712\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-19.png 954w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-19-300x137.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-19-768x352.png 768w\" sizes=\"(max-width: 954px) 100vw, 954px\" \/><\/a><figcaption class=\"wp-element-caption\"><sup>Rendering of the Base Building, North West view<\/sup><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-20.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"464\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-20.png\" alt=\"\" class=\"wp-image-1713\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-20.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-20-300x143.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-20-768x365.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><figcaption class=\"wp-element-caption\"><sup>Rendering of the Base Building, South East view<\/sup><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-21.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"774\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-21.png\" alt=\"\" class=\"wp-image-1714\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-21.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-21-300x238.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-21-768x610.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><figcaption class=\"wp-element-caption\"><sup>Annual Energy Consumption by Endues<\/sup><\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-22.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"231\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-22.png\" alt=\"\" class=\"wp-image-1715\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-22.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-22-300x71.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-22-768x182.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-23.png\"><img loading=\"lazy\" decoding=\"async\" width=\"975\" height=\"236\" src=\"http:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-23.png\" alt=\"\" class=\"wp-image-1716\" srcset=\"https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-23.png 975w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-23-300x73.png 300w, https:\/\/climaticdesign.net\/wp-content\/uploads\/2024\/11\/image-23-768x186.png 768w\" sizes=\"(max-width: 975px) 100vw, 975px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project Location: Baltimore MarylandOwner: Board of Public WorksArchitectural Firm: WGM Architecture + InteriorsGross floor area: 45,500 GSFProject type: Office Climatic Design LLC (CDL) has performed a simplified energy model simulation, a comprehensive energy analysis, and an assessment of the building systems and configuration for the E.F. Borgerding District Court (Borgerding DC). In addition, a Life [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1710","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1710"}],"collection":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1710"}],"version-history":[{"count":1,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1710\/revisions"}],"predecessor-version":[{"id":1717,"href":"https:\/\/climaticdesign.net\/index.php?rest_route=\/wp\/v2\/pages\/1710\/revisions\/1717"}],"wp:attachment":[{"href":"https:\/\/climaticdesign.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}