Maryland Female Detention Center
Project Location: Frank Tippett Road, Cheltenham, Maryland
Owner/Client: Department of Juvenile Services
Architectural Firm: Gram and Parker G+P
Rating system: LEED v4 BD+C: NC
Gross floor area: 92,800 sq ft
Anticipated end date: April 2025
Project type: Public Order and Safety
Climatic Design LLC has performed a preliminary energy analysis for the Maryland Female Detention Center based on the simulation results of a simple box energy model. Multiple Energy Conservation Measures (ECMs) were modeled to satisfy requirements of the LEED v4 IP credit. The simulation results demonstrated that by applying the recommended ECMs to the proposed design the project not only meets Minimum Energy Performance requirement but also qualifies for additional LEED points. The facility would be more than 19% energy cost efficient than the ASHRAE 90.1-2010 reference model. This equals to seven (7) points for a LEED-NC v4 project.