BSAPR New Office Renovation

Project Location: Fort Worth, Texas
Architecture Firm: Terralogos eco architecture pc, Baltimore, Maryland
Project description: A three-story structure with a total of 10,121 GSF,

This three-story building was rehabilitated from Apartments to Offices. An existing conditions energy model predicted the total annual utility bills to be approximately $9,700 per year, or an average of $808 per month.

For this project CDI recommended the following ECMs be implemented:

1- Provide Spray Foam Insulation on all Exterior Walls
2- Replace Windows with Low-E Historic Insulated Replacement Windows
3- Install High Efficiency Conventional Equipment (Cooling: 14 SEER Minimum, Heating: 90% Gas Furnaces)
4- Install External Shading for South Windows
5- Install Internal Insulated Shades on West Windows
6- Reduce Lighting and Power Load by a Minimum of 25% from the ASHRAE Standard.

Climatic Design = Energy Savings + Protecting the Environment
Call CDI to meet your energy savings

Return
Home