Youth Detention Center

Youth Detention Center

Project Location: Baltimore, Maryland
Architecture Firm: PSA – Dewberry + Penza Bailey Architects, Baltimore, Maryland
Project description: A three-story structure with a total of 52,317 GSF
LEED Rating: Awarded LEED v3 Gold
Certification Date: November 2017

YDC-3D Image

CDL has performed a whole-building energy model simulation, a comprehensive energy analysis, and an assessment of the building systems and configuration for the BCDC Youth Detention Center (YDC) in Baltimore, Maryland. Multiple Energy Conservation Measures (ECMs) were modeled. With the execution of selected ECMs, The proposed design meets Minimum Energy Performance. The facility is 26.77% ($60,503/yr) more efficient than the “ASHRAE 90.1-2007 Baseline” facility. The project has been awarded 8 EAc1 credit points in LEED-Online.

Design_NE

Rendering of Baseline Case with the original “As Is” orientation and windows in the existing building and evenly distributed windows in the new building per ASHRAE 90.1-2007 requirements, North East view

Baseline-Walls_SW View

Rendering of Baseline Case showing construction types per ASHRAE requirements, South West view

Baseline-Glazing_NW View

Rendering of Baseline Case showing glazing types and skylights per ASHRAE requirements, North West view

To make the project as energy efficient as possible, the project team implemented following Energy Conservation Measures.

1. The baseline building’s roof insulation value is around R-16, the insulation value of the existing part of the project is R-0.78. Selected roof systems for the project have assembly U-value of 0.032 (R-30) and 0.037 (R-27).

2. The insulation value of the baseline building’s exterior walls is R-16 and this value for exterior walls of the existing SUI building is R-1.72. Selected wall systems of new part of the project have U-value of 0.053 (R-19) to U-0.066 (R-15). Assembly U-value of exterior walls of the existing building in the proposed design is the same as the baseline case.

3. The baseline building’s window assembly U-value in the new building for storefront windows is 0.5 and for all other windows is 0.55. This value for the existing part of the project is 0.85. Assembly U-values of the glazing implemented in the project including the existing part but excluding the security windows, as described in table 1-1 are much lower than the baseline energy model (0.14 to 0.36).

4. The baseline building’s skylight assembly U-value is 1.17. Assembly U-value of the skylights in the proposed design is 0.60.

5. Per ASHRAE Standard 90.1-2007 the baseline building has no daylighting control, but in the proposed design lights of all spaces with windows or/and skylights are controlled by daylight sensors. All the spaces within the project have, with 30% dimming.

6. Using the ASHRAE Standard 90.1-2007 “Building Area” method for lighting power density, calculated average internal lighting power density (LPD) of the baseline building is 1.05 Watt per square feet (W/sf). Calculated average internal LPD of the proposed design is 0.8 W/sf, which is more than 23% below the ASHRAE Standards.

7. The proposed design HVAC systems, packaged single zone roof top units with furnace heating, and heat recovery wheel are more energy efficient that the baseline building’s HVAC systems.

8. Decentralized electrical hot water systems of the proposed design are using less energy than centralized baseline building hot water system.